Engineering case
WH-Water Sewage Project-UZB
Government of Uzbekistan is implementing the 2nd phase of Project "Sewerage systems of Bukhara and Samarkand cities" through regional Water Supply Utilities (BVK and SVK) and Project Coordination Group (PCG) in Tashkent. The main objective of the Project is to increase efficiency and stability of the sewerage system operation in Bukhara and Samarkand. This shall be achieved by means of reconstruction of the sites of existing sewerage systems and facilities as well as expansion of municipal sewerage system in chosen areas not connected to municipal sewerage system at present.
The products provided by WH-STEEL in this project include
1.AIR PIPE inside building
ABOVE GROUND PIPE - A53
From Blowers - to Building limit (external included)
Pressure pipe, Working pressure 800mbar - DN500
2. Decanted Water UNDERGROUND PIPE, depth<6m
from NEW DISTRIBUTION PIPE
To Aeration Tanks - Carbon Steel
PIPE FITTINGS - Working preasure max 0,6bar -From DN50 to DN 1200
3. Coated: Internaly - with an epoxy lining shop applied complying with AWWA C210-92. The minimum dry film tickness shall be at least 406 micromn
External- conform with AWWA C 218 coating consist of prime coat of rust-inhibition pigment alkyd primer followed by two coats alkyd enamel.
Tel: +86 157 2731 7311
Tel: +86 157 2731 7311
E-mail: sales@whsteelfittings.com
Factory Add:Zhenggang Industrial Park, Yanshan County, Cangzhou City Hebei Province, China.
Tel: +86 157 2731 7311
Tel: +86 157 2731 7311
E-mail: sales@whsteelfittings.com
Office Add:No.8013 FuHuaHongYan Building,HongYan South road,Chaoyang District ,Beijing ,P.R.CHINA
SOCIAL MEDIA
Copyright © 2020 WH-STEEL 冀ICP备20009811号 Powered by www.300.cn