Pipe Fittings, Flanges for Oil, Gas, Electric Power, Shipbuding, Chemical Engineering from WH-STEEL CO., LTD.
Home >> News

Steel Pipe Manufacturing Process

Jan 11, 2019

Steel pipe such as the Carbon Steel Tee manufacturing process: 

(1) Forming (welding)

Forming is an indispensable process for the manufacturing process of all pipe fittings.

(2) Heat treatment

Through the heat treatment steps of heating, heat preservation and cooling, the work hardening, residual stress, metal deformation defects, etc. generated during the forming process are eliminated, and the metal structure and properties of the formed pipe are changed, and the state before the deformation process or the performance can be restored. Improve and improve.

(3) Surface treatment

The surface treatment of the pipe such as the Stainless Steel Elbow is usually carried out by sand blasting, shot blasting, sanding, pickling, etc. to remove rust, scratches, etc. on the surface of the product to achieve a smooth surface.

Weld Neck Flange

(4) Cutting processing

The cutting process is a process of completing the welding end portion, the structural size, and the shape tolerance of the pipe such as the Weld Neck Flange.

(5) Non-destructive testing

Non-destructive testing is an important process for testing defects in materials and fittings.

(6) Surface protection

For the surface protection of carbon steel and alloy steel pipe parts, the method of painting is usually adopted, and the method of passivation after pickling is applied to stainless steel.

(7) logo

Marks are an integral part of the product and are the basis for achieving traceability requirements.

Elbow Packaging Elbow Packaging View More
Mitre Bend with 3LPE Mitre Bend with 3LPE View More
45°Bend with 3LPE 45°Bend with 3LPE View More
30° 4D  Bend 30° 4D Bend View More
  • Tel: +86 157 2731 7311
  • Fax: +86-317-6392671
  • E-mail: sales@whsteelfittings.com
  • Factory Add:

    Zhenggang Industrial Park, Yanshan County, Cangzhou City Hebei Province, China.

  • Tel: +86 157 2731 7311
  • Fax: +86 10 5716 3742
  • E-mail: sales@whsteelfittings.com
  • Office Add:

    No.8013 FuHuaHongYan Building,HongYan South road,Chaoyang District ,Beijing ,P.R.CHINA

Copyright © WH-STEEL Co., Ltd. All Rights Reserved |Sitemap|

Chat Online
kellyzhang200454 WhatsApp Wechat QQ QQ
Exhibition

2019 The 19th CIPPE exhibition

Time: 2019.3.27-29

Booth No: W3643

Country: Beijing,China

16th MOSCOW INTERNATIONAL OIL AND GAS EXHIBITION

Time: 23-26 April 2019

Booth No: pavilion3 hall13

Country: MIOGE 2019 • Moscow • Crocus Expo